5

Techno Music

3yo Colt · 8-8 · OR 70

Gulfstream · Race 3 - Starter Optional Claiming · 1m 110y

#4

Rank

Odds

1/1

Win Prob

0%

Place Prob

2%

Rank

#4

Class Advantage Projection

Class readCLASS EDGE
OVER-MARKEDflattered by its mark
Move
Strength22%

What the class read says

The stable looks to have run this horse in stronger races to keep its official rating low — today's class drop may be intentional. Worth watching at a price. A caution, though: it has NOT been beating its handicap mark — the favourable class picture isn't yet backed by mark-adjusted finishes.

Held its own mid-division in 3 of 3 stronger races — solid form context.

Dropping 1 class level from its toughest race — well-positioned today.

Class-adjusted form 4.4 /10 (raw 3.8)

Highest class:
Recent avg: C7.0
Today:
Class gap: -0.5
Higher-class runs: 3
Stronger class form context

Handicap Mark vs Finish

FrontBackC6 @ Gulfstream 06/07/2025 · Pos 4th of 7 · OR - · 5f110y Fas 118 · HIGHER CLASS6/07C6C6 @ Gulfstream 02/08/2025 · Pos 5th of 9 · OR 77 · 6f Fas 118 · HIGHER CLASS · below its mark02/08/2025 · OR 77 par2/08C6OR 77C6 @ Gulfstream 30/08/2025 · Pos 5th of 8 · OR 70 · 6f110y 120 · HIGHER CLASS · below its mark30/08/2025 · OR 70 par30/08C6OR 70C9 @ Gulfstream 13/09/2025 · Pos 4th of 8 · OR 68 · 6f110y 120 · below its mark13/09/2025 · OR 68 par13/09C9OR 68C9 @ Gulfstream 12/10/2025 · Pos 1st of 9 · OR 65 · 1m70y Fas 120 · beat its mark12/10/2025 · OR 65 par12/10C9OR 65projClass-projected finish: 4th of 6
Mark par — where its OR said it should finishActual finishProjected finish today — green strong → red weakDot colour = race gradeRing = higher class than today
DateCourseClsPosAdjGap
2025-10-12Gulfstream?1st3rd2
2025-09-13Gulfstream?4th6th2
2025-08-30Gulfstream?5th4th+1
2025-08-02Gulfstream?5th4th+1
2025-07-06Gulfstream?4th3rd+1

Position-In-Market Trend

0255075100today6/072/0830/0813/0912/10
Expected Actual Regression 68% CI
Projected finish4th of 6
EDGING AHEADslightly over its price
Trend
Strength95%

What the projection says

Edging in front of its market price lately. Projected 4th of 6.

DatePosSPExpActΔ
06/07/20254th9/276%50%-0.26
02/08/20255th14/126%50%+0.24
30/08/20255th16/116%43%+0.27
13/09/20254th6/492%57%-0.35
12/10/20251st1/195%100%+0.05